Asphalt Shingle Systems
Architectural or 3-tab, fastened to manufacturer nailing pattern with ice-and-water shield at eaves and valleys.
- Wind rating110–130 mph
- Warranty25–50 yr
SHEET A-00 — COVER
Luxerenova engineers roofing systems around pitch, wind exposure, and deck condition first — then installs shingle, metal, slate, or membrane to match. Licensed, insured, and rated for 130 mph uplift.
SHEET A-10 — CAPABILITIES
Architectural or 3-tab, fastened to manufacturer nailing pattern with ice-and-water shield at eaves and valleys.
Panels formed on site and mechanically seamed for a continuous, fastener-free weather surface.
Natural slate or engineered composite, hung individually with corrosion-resistant copper fasteners.
Heat-welded single-ply membrane for additions, porches, and commercial low-slope decks.
Emergency tarping within hours, documented for your insurer, then full repair once claims clear.
A 40-point structural and weatherproofing survey with photos, moisture readings, and a written report.
SHEET A-20 — SPEC SHEET
SHEET A-30 — BUILD SEQUENCE
Every set of construction drawings stacks layers — structure, then systems, then finish. We install the same way, each layer covering and protecting the one underneath.
We measure pitch, span, and wind exposure, then check attic ventilation and deck condition from inside before ever pricing material.
Old roofing comes off down to the sheathing. Soft or rotted decking is itemized and replaced before anything new goes back on.
Ice-and-water shield at eaves and valleys, synthetic underlayment across the field, new flashing at every wall, vent, and chimney.
Shingles, panels, or tile go on to code and manufacturer spec, fastened to the pattern your wind zone requires.
A magnetic nail sweep, a fastening spot-check, and your warranty paperwork — filed, not just handed over.
SHEET A-40 — PROJECTS
SHEET A-50 — FIELD NOTES
They found soft decking our last roofer never flagged, itemized it before touching a shingle, and the invoice matched the quote exactly.
— Dana R.
Asked for the actual wind-uplift numbers for our pitch and elevation, not a generic figure. Got a one-page spec sheet before we signed anything.
— Marcus T.
Storm hit at 9pm, tarp crew was on the roof before midnight, and the inspection report was ready for our adjuster the next morning.
— Priya K.
Commercial membrane job, three units, done on schedule with a photo log for every layer. No surprises on closeout.
— Owen B.
SHEET A-60 — CONTACT
A project lead reviews every request and calls back within one business day — sooner for storm damage.